Most homes here run on gas
Utility gas heats 66.3% of homes in Hill County. Another 15% use bottled or LP gas, so most houses already have a gas furnace doing the heating.
Takes about a minute. No obligation.
Utility gas heats 66.3% of homes in Hill County. Another 15% use bottled or LP gas, so most houses already have a gas furnace doing the heating.
Havre winters still need a furnace running on the coldest days. A heat pump installed here usually pairs with the gas system already in place, handling milder days and splitting the load with it.

NOAA nClimDiv, 1991–2020 normals
The old furnace or AC doesn't have to go anywhere.
A heat pump can share the space with it, ready to take over the cooling and the mild days.



Heat here runs from September through June, so August is the month to get a heat pump installed. That gives time to get the furnace tied in properly before the first cold snap asks anything of either one. Wait until the heat is already on and the choice gets rushed, with whatever's in stock going in cold. Cooling is short here, just July and August, so most of the heat pump's work will be sharing the load with the furnace. Getting that handoff set up before September gives it a full season to prove out before winter leans on it.
A standard-size heat pump, installed at a standard efficiency rating, is the right call here. Montana electricity runs 12.66 cents per kilowatt-hour, nothing that pushes the case toward a bigger or pricier unit. Since the furnace keeps doing the heavy lifting on cold days, sizing the heat pump for the mild stretches and the summer cooling load is all this job needs.
Find a contractorHalf the homes in Hill County were built in 1971 or earlier. A house that old wasn't built with a heat pump in mind, and the ductwork or electrical panel may or may not be ready for one. That's worth having checked before install day, not during it. None of this rules a heat pump out. It just means the install has to account for the house it's going into, not just the one on the spec sheet.
When a heat pump pairs with a furnace instead of replacing it, the controls are what decide the cost. A thermostat that can run both systems and hand off between them correctly costs more to install than one that just runs a single system, and getting that handoff wired right takes more of the installer's time.
A heat pump needs its own electrical circuit and a level pad outside, close enough to the indoor coil that the line set doesn't have to run far. If the panel has no room for another circuit, or the spot outside needs grading or a new pad poured, that work gets priced in before the unit ever arrives.
Sizing a heat pump starts with a load calculation, not a guess based on square footage. A contractor works out how much heat the house loses on a cold day and how much it gains on a hot one, factoring in windows, insulation, and how the place is laid out. Too big and the unit short cycles, running in bursts that never pull enough moisture out of the air and wear the compressor down faster. Too small and it runs constantly without catching up, leaning harder on whatever backup heat is paired with it. Since this one only has to cover mild days and summer cooling, the calculation is working with a smaller slice of the load than a heat pump carrying the whole house would. Getting that number right is what decides the unit size, not the other way around.
Install day starts outside, setting the pad and running the line set and electrical before the unit ever gets mounted. Once the outdoor unit is set, the indoor coil gets tied into the existing ductwork, and that's where a lot of the real work happens, sealing the joints so air isn't leaking out before it reaches a room. The line set gets connected, the system gets evacuated to pull all the air and moisture out of the lines, then it's charged with refrigerant to the exact weight the manufacturer specs, not just until it feels right. Low voltage wiring runs to the thermostat last, since that's what tells the system when to run the heat pump and when to hand off to the furnace. Before anyone packs up, the system gets run in both heating and cooling mode, with the installer checking the temperature split at the vents and listening for anything that doesn't sound right. A rushed charge or a duct connection that was never sealed properly won't show up that day. It shows up months later as a system that runs longer than it should to do the same job.
